eroomtc
Member
- Thread starter
- #1
I received this from RMI today to an inquiry I made. It will be of interest to any RVer's who may be wanting to pull a Gladiator.
We have a 2020 Gladiator coming in May 20th for a baseplate design. Generally it takes about 6-8 weeks after the design, engineering testing and production, before we see it being sold.
I hope this helps
Joshua Watson
Roadmaster Inc
Technical Service
800-669-9690 ext. 172
http://roadmasterinc.com/index.php
We have a 2020 Gladiator coming in May 20th for a baseplate design. Generally it takes about 6-8 weeks after the design, engineering testing and production, before we see it being sold.
I hope this helps
Joshua Watson
Roadmaster Inc
Technical Service
800-669-9690 ext. 172
http://roadmasterinc.com/index.php
Sponsored