Sponsored

Update: Diesel, 3.6BSG, Hybrid, JT, Profit Sharing, 2020MY

JlEngineline

Well-Known Member
Joined
Sep 1, 2018
Threads
20
Messages
268
Reaction score
1,195
Location
Toledo
Vehicle(s)
I Just build them
No word yet on the 3.0 Diesel Engine. Haven't built one in a few weeks.
We have been building the 2.2 Diesel Engines, both LH and RH drives

Built a few 3.6BSG engines. Still no word on if or when we will build them for production.

It has been confirmed that the JL side will be shut down for 3 weeks (Rumor:could be 5 weeks) to begin the re-tool for the all new Plug-in Hybrid Engine.

All JT workers are reporting back Monday 3/11/2019 for training.

This year's profit sharing check was the biggest one I have had since I have been working at Jeep. I want to thank each and every one of you that purchased an FCA product in North America. (will only get a cut of North American sales).

2020MY is scheduled to start July 22nd. *Subject to change

Here is are pictures of the production calendar and profit sharing numbers.

PS.jpg


Work Calendar.jpg
Sponsored

 

Bearded_Dragon

Well-Known Member
Joined
Jul 23, 2017
Threads
13
Messages
1,044
Reaction score
1,219
Location
FL
Vehicle(s)
2018 Mojito! Rubicon
Thanks for the insight! Any word on half doors?
 

Sponsored

alphalife9

Well-Known Member
First Name
David
Joined
Nov 6, 2017
Threads
17
Messages
377
Reaction score
189
Location
Rio Rancho, NM
Vehicle(s)
Z51 C6, Sting Gray JLUR
No word yet on the 3.0 Diesel Engine. Haven't built one in a few weeks.
We have been building the 2.2 Diesel Engines, both LH and RH drives

Built a few 3.6BSG engines. Still no word on if or when we will build them for production.

It has been confirmed that the JL side will be shut down for 3 weeks (Rumor:could be 5 weeks) to begin the re-tool for the all new Plug-in Hybrid Engine.

All JT workers are reporting back Monday 3/11/2019 for training.

This year's profit sharing check was the biggest one I have had since I have been working at Jeep. I want to thank each and every one of you that purchased an FCA product in North America. (will only get a cut of North American sales).

2020MY is scheduled to start July 22nd. *Subject to change

Here is are pictures of the production calendar and profit sharing numbers.

PS.jpg


Work Calendar.jpg
Any info on whether manual trans with new available with 3.6BSG or diesel?
 

Carlton

Well-Known Member
Joined
Sep 2, 2018
Threads
22
Messages
2,912
Reaction score
3,228
Location
Chicago
Vehicle(s)
Jeeps lots of jeeps
Not sure how long Gladiator training is, but it sounds like they will start building soon. Very exciting!
 

SecondTJ

Well-Known Member
Joined
Jan 9, 2019
Threads
8
Messages
1,212
Reaction score
1,134
Location
Il
Vehicle(s)
Jeep
Any info on whether manual trans with new available with 3.6BSG or diesel?
I wouldn't hold my breathe on a manual/diesel combo.

The Gladiator with the 3.0 diesel will be automatic only and the export 2.2 diesel model is also automatic only.

FCA doesn't have a light-medium duty manual transmission to handle the increased torque.
 
Last edited:

Sponsored

californiajeeping

Well-Known Member
Joined
Feb 1, 2019
Threads
46
Messages
2,035
Reaction score
1,746
Location
California
Vehicle(s)
JLUR

Karl_in_Chicago

Well-Known Member
First Name
Karl
Joined
Nov 4, 2017
Threads
14
Messages
827
Reaction score
810
Location
Chicago
Vehicle(s)
Acura RL, Chevrolet Corvette, Harley-Davidson FLHTC Electra-Glide Classic
Grats on the profit sharing, always good to see the workers get a piece of the action when a company is doing well. Thanks for sharing the info you do, it's very helpful. Really looking forward to seeing you guys start churning out those diesels for N.A.
 

GARRIGA

Well-Known Member
First Name
Alejandro
Joined
Apr 25, 2018
Threads
18
Messages
704
Reaction score
441
Location
South Florida
Vehicle(s)
Dodge Durango RT
Occupation
Finance
July orders for 2020? Am I reading that correctly? I’m guessing delivery around 8 weeks later. Is that correct, as well?
Sponsored

 
 



Top