Not sure how I should feel about all this. Ordered my M/T JTR in December and took delivery in mid-February. Last week, with about 600 miles on the engine, the clutch pedal failed (bottomed out). After a tow into my dealer, they replaced the master cylinder. Based on their reporting, they...
I’m in my mid-40s and have been driving both Manual and Automatic transmissions since I was 15. I’ve also owned several MT Jeep Wranglers in the 1990s. Currently, I own both a 2019 JLU Sport S and a 2020 JT Rubicon in the Manual Transmission. I’ve run the exact same MOPAR 2” lift on both, with...
Good evening MT Club, I have a question to put out. Took delivery of my JTR a few weeks ago that I ordered in December. I noticed a little extra “play” in the clutch pedal upon delivery, but otherwise l liked how smooth the clutch is compared to my 2019 JLU Sport. Yesterday, only around 600...
I went with the Chupacabra Mirrors on Amazon.com, and went the Topsy Products Stack, Rack, and Roll System with a Harbor Freight 2000lbs Engine stand. Can hang all four doors/or tube doors and cart them around the garage or driveway for under $290. Not the smallest form-factor, but a good...
That is bazaar. I ordered my JTR with a Manual Transmission on 19 December and took delivery on 14 February. Seems odd that you ordered yours over a month before mine, yet they built mine. There are “gremlins” in every system. Second Law of Thermodynamics....
Ordered my 6 Speed (With front facing camera) Rubicon in Sting Gray on 19 December. Vehicle was delivered to Florida dealership on 13 February. Went from Paint to Trim, through Build sheet/Sticker in less than 2 weeks. Only had a 1-day delay at the rail yard before getting loaded up. Spent...
Not sure, I went from Trim to KZ and Window Sticker in about 7 days. However, I am getting some conflicting information between an ETA to dealer of about two weeks, and being told there is a delay. I suspect, in my case, that Jeep is waiting to FILL the rail car heading to Florida before they...
My build was at “G” last Friday and hit “JS” yesterday. I have a build sheet but no window sticker yet. Any trends on how quickly a build goes from JS to shipped?
Thanks.