Sponsored

Search results

  1. Gladiator Window Sticker and Build Sheet Order Tracking

    I went JB status on Monday as of yesterday I was still waiting.... with no new information as of now. I took the advice of another person and my build timeline is in my signature
  2. Gladiator Window Sticker and Build Sheet Order Tracking

    I have dual top also. I just checked again and was told I'm JB then final inspection and shipping. Give it about a week.
  3. Gladiator Window Sticker and Build Sheet Order Tracking

    My order went from E Friday afternoon to JB Monday. Now for the bedliner backup... I hope you get it soon!
  4. Post your 2020 JT Gladiator build status

    I was E status on Friday afternoon. I'm currently JB, waiting for vendor installation, my guess is the spray in bedliner. 5/2 order. Build sheet arrived today.
  5. Gladiator Window Sticker and Build Sheet Order Tracking

    1LIEPE BUILD SHEET showed up today! Now praying I'm not sitting in JB hell forever
  6. Gladiator Window Sticker and Build Sheet Order Tracking

    From what I can find the sequence for the build process is: (correct me if I'm wrong) Still trying to figure approximate time in status. BA: New order that hasn't been checked BB: Review by fleet department BD: Special equipment processing BE: Edit error BG: Passed edit n/a for schedule BGL...
  7. Gladiator Window Sticker and Build Sheet Order Tracking

    Looks like we ordered similar. If you ordered May 2nd give it a few hours. If you ordered a few days later. Good luck! There was an order that was 3 days before mine
  8. Gladiator Window Sticker and Build Sheet Order Tracking

    Order accepted 5/2 VON and VIN assigned 5/4 D1 all parts in and build sequence ready 5/6 Estimated delivery 6/2 Dealer complained on 6/6 Today 6/7 E status (framing)
  9. Post your 2020 JT Gladiator build status

    Order accepted 5/2 VON and VIN assigned 5/4 D1 all parts in and build sequence ready 5/6 Estimated delivery 6/2 After a whole lot of BS with Chrysler chat and the dealer. Today 6/7 E status (framing)
  10. Post your 2020 JT Gladiator build status

    Areti did the same thing to me the other day so I saved the chat for proof. He needs a different job?
  11. Gladiator Window Sticker and Build Sheet Order Tracking

    I agree with you more than you realize. I talked to my dealer yesterday, who contacted FCA again. They told him the information in the system is correct. Dealer replied, "you realize the system says order accepted 5/2, von and vin assigned 5/4, D1 all parts in and build sequence ready 5/6...
  12. Better for residual: Auto or Manual Trans...?

    I have a manual 16 JKU HR also and people are afraid of it. It is Granite :rock: with red accents everywhere. That being said my trade in value is 1000 less because it is a manual. (That was a 5000 option at purchase)
  13. Gladiator Window Sticker and Build Sheet Order Tracking

    @2020 SCRAMBLER you are currently the build under mine on the tracker 1Liepe. Nothing personal but I really hope my build status changes before yours.
  14. Gladiator Window Sticker and Build Sheet Order Tracking

    This one you just enter your VIN and it works if its available. https://fcacommunity.force.com/RAM/s/equipment-listing
  15. Gladiator Window Sticker and Build Sheet Order Tracking

    You had me until number 4. That should be dealer contact, "Hey, John salesmen, I saw my steel bumper is holding things up. Let's modify that on the order." @JeepCares so like the VOTS that was taken down in 2015ish. Just add the disclosure this is for information purposes only. Don't assume...
  16. Gladiator Window Sticker and Build Sheet Order Tracking

    Don't give up! I hear ya. I ordered 4/26 revised from Granite LE to Black loaded spec on 5/2. June 2nd estimate has come and gone. Just a bit of information. My Jeep JKUHR order 3 years ago took 4 weeks on an established assembly line.
  17. What's the purpose of the slant top?

    :facepalm: :CWL:
  18. Gladiator Window Sticker and Build Sheet Order Tracking

    Here is a good one.:( Started a chat with FCA chat was told, "All the materials for your order have been gathered, Bruce, it is just waiting to be built now." I reply, "The dealer stated it had a June 2nd delivery date?" FCA nope you just order May 8th can take 8-12 weeks. Can sit like this for...
  19. What's the purpose of the slant top?

    When I change my hardtop to the fastback top my gas mileage goes up 10%. That being said it is also a look preference. As for the JT if you look at the roll cage design it would not even be an option. This is the Rubi HardRock that will be sold very shortly (lol) for my JT. First 32,000 gets it...




Top