Scrambler84
Well-Known Member
- First Name
- Patrick
- Joined
- Jan 22, 2018
- Threads
- 2
- Messages
- 53
- Reaction score
- 61
- Location
- Alexandria VA
- Vehicle(s)
- 2021 JTR Diesel, 2012 JKUR, 1984 Scrambler
- Occupation
- Network Engineer
- Thread starter
- #1
Cut 10 In long aluminum c channel for outriggers drilled holes in them for stainless bolts that were included with the rack, put them in the 1 in square tubing holes on the rack and had the thule trays to hold the bikes, got on one each side now. Doesn't stick out past the fenders.
Sponsored