Sponsored

Could someone list all the abbreviations...

smlobx

Well-Known Member
First Name
Eddie
Joined
Jun 28, 2018
Threads
86
Messages
2,639
Reaction score
4,487
Location
Mid Atlantic
Vehicle(s)
JTR, F-350 diesel, Porsche Spyder, Model Y
Occupation
Semi retired consultant
In the production process in chronological order and explain what each one means??

I’ve seen so many abbreviations it’s mind boggling. Thanks!
Sponsored

 

trez63

Well-Known Member
Joined
Feb 19, 2019
Threads
45
Messages
397
Reaction score
465
Location
California
Vehicle(s)
2020 Jeep Gladiator Launch Edition, 2018 Acura NSX, 2016 Range Rover Sport SVR, 2018 Land Rover Discovery, 2017 Kawasaki Z900
In the production process in chronological order and explain what each one means??

I’ve seen so many abbreviations it’s mind boggling. Thanks!
It’s already in the first pinned thread above.
 
OP
OP
smlobx

smlobx

Well-Known Member
First Name
Eddie
Joined
Jun 28, 2018
Threads
86
Messages
2,639
Reaction score
4,487
Location
Mid Atlantic
Vehicle(s)
JTR, F-350 diesel, Porsche Spyder, Model Y
Occupation
Semi retired consultant
OP
OP
smlobx

smlobx

Well-Known Member
First Name
Eddie
Joined
Jun 28, 2018
Threads
86
Messages
2,639
Reaction score
4,487
Location
Mid Atlantic
Vehicle(s)
JTR, F-350 diesel, Porsche Spyder, Model Y
Occupation
Semi retired consultant
Thanks...I just didn’t look that far into the thread.
 

Sponsored

DanOnTheCob

Well-Known Member
First Name
Danny
Joined
Apr 10, 2019
Threads
9
Messages
264
Reaction score
375
Location
Cincinnati, OH
Vehicle(s)
Jeep Gladiator Rubicon
Unscheduled:
BX – good order available for scheduling
BB – fleet order only – review by bid department
BD – special equipment processing
BE – edit error – coding error which must be corrected before order can be scheduled
BG – order has passes edit but cannot be scheduled regardless of sold status

Reason Codes:
F – Finance hold – automatic cancellation after 15 days
B – Model or option build out
L – Material restriction
M – Material hold (fleet)
ZA – canceled order

Scheduled:
C – Tentative schedule
D – Firm schedule: serial number assigned, approx. time in station – 5 days
D1 – gateline: unit sequenced for production, est. ship date assigned, Approx. time in station – 12 days

Build:
E – Framing
F – Paint
G – Trim

Built:
I – unit built, pending final inspection
J – Vehicle passed final inspection but not released to carrier
JB – shipped to body vendor
JE – shipped to emissions
JJ – consigned to body vendor
JS – shipped to storage
KZ – released by plant and invoiced

Traffic Codes:
KZ L – released but not shipped KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ OA – plant hold, quality audit
KZ OB – zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle diverted
KZ OC – carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error
KZ OD – mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH – all other “O” type carrier codes
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
KZ Y2 – major damage – vehicle sold at auction
 

Jeepznthingz

Well-Known Member
Joined
Jan 3, 2019
Threads
11
Messages
728
Reaction score
663
Location
USA
Vehicle(s)
2020 Gladiator Rubicon LE GCM
Unscheduled:
BX – good order available for scheduling
BB – fleet order only – review by bid department
BD – special equipment processing
BE – edit error – coding error which must be corrected before order can be scheduled
BG – order has passes edit but cannot be scheduled regardless of sold status

Reason Codes:
F – Finance hold – automatic cancellation after 15 days
B – Model or option build out
L – Material restriction
M – Material hold (fleet)
ZA – canceled order

Scheduled:
C – Tentative schedule
D – Firm schedule: serial number assigned, approx. time in station – 5 days
D1 – gateline: unit sequenced for production, est. ship date assigned, Approx. time in station – 12 days

Build:
E – Framing
F – Paint
G – Trim

Built:
I – unit built, pending final inspection
J – Vehicle passed final inspection but not released to carrier
JB – shipped to body vendor
JE – shipped to emissions
JJ – consigned to body vendor
JS – shipped to storage
KZ – released by plant and invoiced

Traffic Codes:
KZ L – released but not shipped KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ OA – plant hold, quality audit
KZ OB – zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle diverted
KZ OC – carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error
KZ OD – mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH – all other “O” type carrier codes
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
KZ Y2 – major damage – vehicle sold at auction
I do not see KZS on the list.
 

Jeepznthingz

Well-Known Member
Joined
Jan 3, 2019
Threads
11
Messages
728
Reaction score
663
Location
USA
Vehicle(s)
2020 Gladiator Rubicon LE GCM
Well, I tried
Ha! Not against you. I’m saying now, you can be in kZS status and it must be a new one they just thought up, and haven’t added to the list yet. Thanks for posting it, Dan!
Sponsored

 
 







Top