Deleted member 24880
- Thread starter
- #1
So I decided to roll the dice on a set of RC nerf steps. These look identical to NFAB nerfs that I looked at and are $50 less. They arrived this morning and install took me 30-40 minutes tops by myself. I’m really digging these things. 3 vertical and 4 horizontal bolts attach the 5 different brackets on each side to the Gladiator. They are solid as hell and hide the pinch weld perfectly. Only couple of issues I noticed. 1-the center seems to appear to bow in toward the B pillar more but I think that is because of the body shape (optical illusion). 2- neither end of the main tube is solid. They are wide open. Initially I wasn’t real excited about that thinking shit will get in there and cause quicker rotting. Then I thought with both ends open it shouldn’t hold water, allow air in to dry better and I can simply hose whatever gets in there out. I will see how they hold up. Check out the pictures and I like the nice little JT cut into the middle bracket.
Sponsored