kauffmj1
Well-Known Member
Black Hard TopNice!! What boxes did you check on your Mojave?
Soft Tri-fold Tonneau
Bed Liner
Aux switches
Painted fenders
Cold weather group (remote start, heated seats, heated steering wheel)
Leather seats
All weather mats
Hopefully that TBD ETA on the tracker today means it delivered and not that its paused in some yard for lord knows how long. I saw all sorts of crazy stuff earlier this year with our Ram order. It sat 1 hour from my house in a storage yard for 3 weeks so this last piece has the least visibility and the most chances for delays.
The weird thing this time around is that I got the status update emails from Jeep up to Production. Then I got nothing at all saying it was built or shipped. It was also weird it showed going into Production 9/8 but then it not being built until 9/22. Seems like an oddly wide gap between those two steps. That's normally a day or two unless they lump in the offsite time for the bedliner and tonneau options. Who knows with Stellantis?!
Sponsored