Mr. Manners
Well-Known Member
Overland non-diesel. Loaded, So I’m not sure if that will hold it up longer or not.what model? is it a diesel?
Sponsored
Overland non-diesel. Loaded, So I’m not sure if that will hold it up longer or not.what model? is it a diesel?
If you try Jeepchat three times in a day you can get three different answers to the same question. It’s ridiculous. Just call your salesman, as he has access to the most accurate information if he knows what he’s doing.UPDATE!!!
Was told last week I was in paint and delivery estimated 9/16 (according to Dealership). Today, Jeep Chat told me I haven’t even been scheduled to start build process. I don’t understand how this can be so screwed up...
Thanks!!! Can you tell I’m a first time orderer (if thats the correct term). I’m trying to add the front camera, if it’s not scheduled yet, so I’m 50/50 on which one I WANT to believe.If you try Jeepchat three times in a day you can get three different answers to the same question. It’s ridiculous. Just call your salesman, as he has access to the most accurate information if he knows what he’s doing.
Assuming none of these 2021 orders are diesel?? still waiting to hear one of the diesels have been built....I'm wondering if the diesels are delayed and they are only building gassers right now.....Ordered on 08/01 with Rob Trachtman
got a text tody from him ( "Oder Code Status KZR, which is built but not released for shipment yet")
I confirmed with Jeep Chat and they are just waiting for the shipment order and then they can give me an ETA.
yea, 3.6V GasAssuming none of these 2021 orders are diesel?? still waiting to hear one of the diesels have been built....I'm wondering if the diesels are delayed and they are only building gassers right now.....
My gasser was built on the 20th. Was in JB by the morning of the 21st. I’ve come to the conclusion that no one really knows what the hell is going on...Saw a post in another thread that diesel production starts on 9/4. Gasser production started first on 8/24.
Seems to match with the tracking list on the window sticker thread.. Looks like all the build sheets found thus far are for gassers.
So, hopefully I will see something in the build sheet link by next week. I ordered a 2021 JTR diesel on 7/11.
I was told by Jeep Chat that they arr not allowed anymore to see the status codeMy gasser was built on the 20th. Was in JB by the morning of the 21st. I’ve come to the conclusion that no one really knows what the hell is going on...
my salesman told me yesterday he’s tracking the train car and expects the Jeep at the dealership first thing next week. Jeep chat told me yesterday I was still in JB status! Lol.
Congrats @eternus i am going to contact my sales man again, hope i got the same luck as you. i see you pulled the trigger with the Max Tow, any plan for your built?My Truck is on the train, headed to Denver... "It will be at the Denver train yard mid-September"... it'll take 2 weeks? Then how long to get from Denver to Longmont... man, what a process! Anyway... I've only ever seen 1 code... D and that was on August 10th.
Nothing elaborate, 34" tires on pretty wheels, Falcon shocks to tune the ride quality, not sure about the leveling or not yet, we'll see how it looks with the tire size. I'm coming from a JKU and very much of the mindset, keep as low a center of gravity as possible. I already have a Softopper in my garage and I ordered the Mopar Trail rails to mount it to. I'll put a black grill on it and then drive it like that for a while. (I'm waiting for AEV or ARB to actually finish their bumpers before I do any armor updates.)Congrats @eternus i am going to contact my sales man again, hope i got the same luck as you. i see you pulled the trigger with the Max Tow, any plan for your built?