Sponsored

Build Status Codes and Sequence

Bruski51

Well-Known Member
First Name
Bruce
Joined
May 7, 2019
Threads
3
Messages
81
Reaction score
85
Location
Michigan
Vehicle(s)
2016 Rubicon HR
Vehicle Showcase
2
The sequence for the build process is: (correct me if I'm wrong) Still trying to figure approximate time in status because there seems to be no rhyme or reason to dime orders taking 2 weeks and others 10+ weeks.

BA: New order that hasn't been checked
BB: Review by fleet department
BD: Special equipment processing
BE: Edit error
BG: Passed edit n/a for schedule
BGL: Edit ok parts unavailable
BX: Passed edit available for schedule
C: Sub firm - Tentative schedule
D: Firm schedule - dealer has allocation and all parts available
D1: Gateline schedule - scheduled to be built
E: Frame
F: Paint
G: Trim
I: Built not ok'd
J: Built ok'd
JB: Vendor Abyss!!!
JE: Emission check
JS: Shipped to storage, really? Someone else near me needs a Jeep or 3!
KZ: Released by plant , invoiced (window sticker)
KZL: Released - not shipped (see JS)
KZM: First rail departure
KZN: First rail arrival
KZO: Delayed/recieved
KZOA: Plant holds
KZOB: Zone/distribution holds (see JS)
KZOC: Carrier delays
KZOD: Carrier holds
KZOE: Mis-shipped vehicle
KZOF: Show/test vehicle
KZOG: Damaged vehicle
KZOH: All other reasons
KZT: Second rail departure
KZU: Second rail arrival
KZX: Delivered to dealer
ZA: Canceled
Sponsored

 
Last edited:
OP
OP
Bruski51

Bruski51

Well-Known Member
First Name
Bruce
Joined
May 7, 2019
Threads
3
Messages
81
Reaction score
85
Location
Michigan
Vehicle(s)
2016 Rubicon HR
Vehicle Showcase
2
Build codes.
Unscheduled:
BA
– order entered in system by dealer
BB – fleet order only – review by bid department
BD – special equipment processing
BE – edit error – coding error which must be corrected before order can be scheduled
BG – order has passes edit but cannot be scheduled regardless of sold status
BX – good order available for scheduling

Reason Codes:
F – Finance hold – automatic cancellation after 15 days
B – Model or option build out. Your order exists but isn't fully confirmed yet. Plant doesn't know about it yet. Systems are checking the order to ensure it's valid in terms of sales codes.
L – Material restriction
M – Material hold (fleet)
ZA – canceled order

Scheduled:
C – Tentative schedule. Your order is "subfirm". The plant can see the order at this point but it's not fully committed to building as the supplier may or may not be able to get parts to the plant to build the vehicle.
D – Firm schedule: serial number assigned. Firm order. Your order now has a name instead of a number:
D1 – Gate line: unit sequenced for production, est. ship date assigned.
The date is set for your truck to be built. The plant knows when it should have parts sequenced for building and it should start to be built within 48 hours of the date set.
D2 - It's going to be built. The computers are being programmed, materials are being sequenced, framing is about to occur.

Build:
E – Framing. Metal is welded together to form the body and frame. The body is inspected at the end of this step to ensure it's within tolerances.
F – Paint. The metal is coated, primed, sprayed, clearcoated, polished, inspected, and hand finished if necessary.
G – Trim. The engine is installed in the chassis, the interior is installed, the chassis is mated to the body, the bed is put on. At the end of this, your new vehicle is built.

Built:
I – unit built, pending final inspection. Your vehicle goes through a battery of shakedown tests and measurements are taken to ensure the vehicle looks and performs as expected.
J – Vehicle passed final inspection but not released to carrier
JB – shipped to body vendor. JB/KZP-The vehicle is sent off site to have a spray liner put in, steps, etc.
JE – shipped to emissions
JJ – consigned to body vendor
JS – shipped to storage
KZ – released by plant and invoiced. The truck is ready to be shipped. The dealer is actually charged for the truck. As you all know, this can be a source of delay. Typically you see me put two statuses here: Awaiting Shipment and "Staged for Shipment".

Traffic Codes:
KZ L – released but not shipped KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ OA – plant hold, quality audit
KZ OB – zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle diverted
KZ OC – carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error
KZ OD – mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH – all other “O” type carrier codes
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
KZ Y2 – major damage – vehicle sold at auction

KZX - Delivered to your dealer!
 

EPTJ

Well-Known Member
First Name
Eric
Joined
Apr 11, 2019
Threads
4
Messages
50
Reaction score
52
Location
Michigan
Vehicle(s)
2020 Gladiator LE Red 2008 Dodge Ram 2500, 1999 Jeep Wrangler, 1976 F100
I was just thinking about this very thing over the weekend, thanks for starting a post. My LE hit E on 4/13, and I was wondering if it hits E then, would F and G happen basically the same day / next day? My thinking is that the frame is on the assembly line, it should not stop becoming a real vehicle (unless there is an issue and its shuttled off to a repair bay or similar) until it rolls off the end of the line. Unless framing is a spur line to the actual assembly line?

Just trying to make sense of the process.
 

bangolia

Well-Known Member
First Name
Bryan
Joined
Jan 8, 2019
Threads
26
Messages
834
Reaction score
1,053
Location
Garner NC
Vehicle(s)
2014 JKU
This should be a sticky! i just searched for 20 minutes for this.

@JAY
 
OP
OP
Bruski51

Bruski51

Well-Known Member
First Name
Bruce
Joined
May 7, 2019
Threads
3
Messages
81
Reaction score
85
Location
Michigan
Vehicle(s)
2016 Rubicon HR
Vehicle Showcase
2
I can't do that. Wish I could
 

Sponsored

Jake

Well-Known Member
First Name
Jake
Joined
Nov 29, 2018
Threads
68
Messages
1,869
Reaction score
1,517
Location
Charleston,SC
Vehicle(s)
Gladiator Sport
Silly question here:

How can I check the status codes of my order without having to ask my dealership or @JeepCares? I have an order number and I already have my VIN number. Would like you be able to check things on my own so I don’t have to bug people for that simple info. Please point me the way. Thanks
 

rvillano8188

Well-Known Member
First Name
Rob
Joined
May 20, 2019
Threads
38
Messages
799
Reaction score
761
Location
Long Island, NY
Vehicle(s)
2020 Punk'n JT Rubi, 2018 VW Tiguan SEL
Occupation
Financial Services
=
Silly question here:

How can I check the status codes of my order without having to ask my dealership or @JeepCares? I have an order number and I already have my VIN number. Would like you be able to check things on my own so I don’t have to bug people for that simple info. Please point me the way. Thanks
Ehh not an option. I would even say that you would need to check with your dealer AND Jeep chat, as they usually fly directly in the face of each other with different info
 

Sponsored

JeepCares

Well-Known Member
First Name
JeepCares
Joined
Nov 29, 2018
Threads
14
Messages
1,403
Reaction score
819
Location
Auburn Hills, MI
Vehicle(s)
Jeep Family
Occupation
Customer Care
Approx how long from D status to delivery?
Hi Thatrabbitfoot,
Build time can vary based on your particular vehicle configuration. With a new vehicle launch, build time is normally estimated between 10-12 weeks, but again this varies from build to build.
Alex
Jeep Social Care Specialist
 

NYR_4_LIFE

Well-Known Member
First Name
James
Joined
Mar 7, 2019
Threads
7
Messages
58
Reaction score
19
Location
NY
Vehicle(s)
2020 Gladiator
any body know approximately high long from E status ?
 

Turkeyfarmer

Member
First Name
Mike
Joined
Sep 27, 2019
Threads
0
Messages
6
Reaction score
1
Location
Montana
Vehicle(s)
2014 Cherokee
 



Top