Dollykaner
Active Member
TAKING DELIVERY OF MY LE TODAY....DEALER JUST CALLED SHE JUST ROLLED OFF THE TRUCK!!!!! PICTURES TO FOLLOW!!!!
Your dealership should be able to get you your status information, it will not automatically come from anybody else.How long is it taking to complete an order? I ordered mine on 5/24 and I was hoping I'd hear something this week that it's in line, been entered at some factory computer or something else.
How long is it taking to complete an order? I ordered mine on 5/24 and I was hoping I'd hear something this week that it's in line, been entered at some factory computer or something else.
Yeah, I wasn't expecting it from anyone else. I just hadn't heard from him yet.Your dealership should be able to get you your status information, it will not automatically come from anybody else.
Thanks. I'm going to have to comb through the posts and figure out what the letters and numbers actually mean. Thanks.If you skim through a lot of the posts most people ordered in April and begin of May are still waiting. I for one ordered May 2nd went, D1 May 6th and I'm still waiting for build.
Thanks. I'm going to have to comb through the posts and figure out what the letters and numbers actually mean. Thanks.
VIN received, in D status.
Mine entered,
C'MON TRACKER, UPDATE!!!
Unscheduled:
BX – good order available for scheduling
BB – fleet order only – review by bid department
BD – special equipment processing
BE – edit error – coding error which must be corrected before order can be scheduled
BG – order has passes edit but cannot be scheduled regardless of sold status
Reason Codes:
F – Finance hold – automatic cancellation after 15 days
B – Model or option build out
L – Material restriction
M – Material hold (fleet)
ZA – canceled order
Scheduled:
C – Tentative schedule
D – Firm schedule: serial number assigned, approx. time in station – 5 days
D1 – gateline: unit sequenced for production, est. ship date assigned, Approx. time in station – 12 days
Build:
E – Framing
F – Paint
G – Trim
Built:
I – unit built, pending final inspection
J – Vehicle passed final inspection but not released to carrier
JB – shipped to body vendor
JE – shipped to emissions
JJ – consigned to body vendor
JS – shipped to storage
KZ – released by plant and invoiced
Traffic Codes:
KZ L – released but not shipped KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ OA – plant hold, quality audit
KZ OB – zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle diverted
KZ OC – carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error
KZ OD – mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH – all other “O” type carrier codes
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
KZ Y2 – major damage – vehicle sold at auction
I ordered a Sport S on 5/22. By Saturday I had a VIN and was told i was in D1. This was from the online chat system. They said it could be in D1 for up to 30 days. I'll check back again next week. Hope this helpsHow long is it taking to complete an order? I ordered mine on 5/24 and I was hoping I'd hear something this week that it's in line, been entered at some factory computer or something else.
Mine is a non steel bumper Rubicon. Now 7 days past ship estimate.Are all theses orders that are still in D1 steel bumper orders? Ordered mine yesterday. Steel bumper no longer option.
I’m not sure if they saw you post or what . Kinda strange . CongratsMy baby rolling off the truck.
![]()