Dollykaner
Active Member
The waiting is becoming unbearable! I am so anxious for my black beauty LE! The fact that my build was found mid week and I’m checking hourly for my sticker is driving me insane. Ugh. Anyone else in same boat
Better than my white LE, no build or sticker yet. I don’t even have an estimated date.The waiting is becoming unbearable! I am so anxious for my black beauty LE! The fact that my build was found mid week and I’m checking hourly for my sticker is driving me insane. Ugh. Anyone else in same boat
Same here. Probably more frustration coming with the time it will take for transport to dealer!!The waiting is becoming unbearable! I am so anxious for my black beauty LE! The fact that my build was found mid week and I’m checking hourly for my sticker is driving me insane. Ugh. Anyone else in same boat
VIN received, in D status.
Mine entered,
C'MON TRACKER, UPDATE!!!
Unscheduled:
BX – good order available for scheduling
BB – fleet order only – review by bid department
BD – special equipment processing
BE – edit error – coding error which must be corrected before order can be scheduled
BG – order has passes edit but cannot be scheduled regardless of sold status
Reason Codes:
F – Finance hold – automatic cancellation after 15 days
B – Model or option build out
L – Material restriction
M – Material hold (fleet)
ZA – canceled order
Scheduled:
C – Tentative schedule
D – Firm schedule: serial number assigned, approx. time in station – 5 days
D1 – gateline: unit sequenced for production, est. ship date assigned, Approx. time in station – 12 days
Build:
E – Framing
F – Paint
G – Trim
Built:
I – unit built, pending final inspection
J – Vehicle passed final inspection but not released to carrier
JB – shipped to body vendor
JE – shipped to emissions
JJ – consigned to body vendor
JS – shipped to storage
KZ – released by plant and invoiced
Traffic Codes:
KZ L – released but not shipped KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ OA – plant hold, quality audit
KZ OB – zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle diverted
KZ OC – carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error
KZ OD – mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH – all other “O” type carrier codes
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
KZ Y2 – major damage – vehicle sold at auction
When i check the tracker and see Build and Sticker both found are those orders that people already received? I just got my VIN anyone know how long roughly post VIN until the order is delivered? Last question promise, my dealer told me i have a D status. What does that mean? I'm i missing a second part to that? like D1?
I would expect to see some movement early on this week. If not the upcoming holiday weekend will really put a damper on things. Being that there are a ton of JLs built the lead time is in our favor since they only have so much space for "storage". What doesn't help us is the fact the LEs will probably see extra quality inspections being that it is the niche flagship model. The guys that receive theirs with 30-50 miles on it should feel extra special!The waiting is becoming unbearable! I am so anxious for my black beauty LE! The fact that my build was found mid week and I’m checking hourly for my sticker is driving me insane. Ugh. Anyone else in same boat
The waiting is becoming unbearable! I am so anxious for my black beauty LE! The fact that my build was found mid week and I’m checking hourly for my sticker is driving me insane. Ugh. Anyone else in same boat
Shut up. No sympathy from me. Another 7 weeks before they start building Granite LEs.Better than my white LE, no build or sticker yet. I don’t even have an estimated date.
Plus I have an out of country trip in a couple weeks, it’ll probably get to the dealer while I’m away.

I talked to my dealer about that color and they can’t even order that anymore. Nor can they order the steel bumper.Shut up. No sympathy from me. Granite LE here. Another 7 weeks before they start building Granite LEs.![]()
You could only order Granite with the Launch Edition (regular orders never opened for Granite and it's now officially listed as late availability). Knew it was going to be later, but that doesn't make the waiting any easier...I talked to my dealer about that color and they can’t even order that anymore. Nor can they order the steel bumper.
I hate the waiting and am sorry for those that have to wait longer.
you hope its only 7 more weeks...Shut up. No sympathy from me. Another 7 weeks before they start building Granite LEs.![]()

Exactly, us granite folk probably wont see our gladiators until late July or August.Shut up. No sympathy from me. Another 7 weeks before they start building Granite LEs.![]()
Thanks for the support Mr. Negativity.you hope its only 7 more weeks...
![]()
