Sponsored

Build Status Codes and Sequence

SMLDave

Well-Known Member
First Name
Dave
Joined
May 27, 2019
Threads
0
Messages
51
Reaction score
41
Location
Sioux City Ia
Vehicle(s)
2010 Sahara, 07 Caliber. 2020 Gladiator Rubicon Granite Crystal Metallic
Go to the first page, click on, Track new, fill the info in, VIN #, Nick name, Date ordered, and make sure you put the / in between the dates, and your E Mail.
Sponsored

 

Turkeyfarmer

Member
First Name
Mike
Joined
Sep 27, 2019
Threads
0
Messages
6
Reaction score
1
Location
Montana
Vehicle(s)
2014 Cherokee
Go to the first page, click on, Track new, fill the info in, VIN #, Nick name, Date ordered, and make sure you put the / in between the dates, and your E Mail.
Ok, will try when I get Vin#
 

Delhux

Well-Known Member
Joined
Aug 23, 2019
Threads
44
Messages
577
Reaction score
892
Location
Boston, MA
Vehicle(s)
2020 Gladiator - Overland - Gator
Jeep chat gave me this as my status update:

“I am showing that at this time your order is in the scheduling phase of the manufacturing process. The parts required to build the vehicle are being scheduled and as soon as they available and ready, order will be scheduled for build.”
Does this sound like “C” status?

Build codes.
Unscheduled:
BA
– order entered in system by dealer
BB – fleet order only – review by bid department
BD – special equipment processing
BE – edit error – coding error which must be corrected before order can be scheduled
BG – order has passes edit but cannot be scheduled regardless of sold status
BX – good order available for scheduling

Reason Codes:
F – Finance hold – automatic cancellation after 15 days
B – Model or option build out. Your order exists but isn't fully confirmed yet. Plant doesn't know about it yet. Systems are checking the order to ensure it's valid in terms of sales codes.
L – Material restriction
M – Material hold (fleet)
ZA – canceled order

Scheduled:
C – Tentative schedule. Your order is "subfirm". The plant can see the order at this point but it's not fully committed to building as the supplier may or may not be able to get parts to the plant to build the vehicle.
D – Firm schedule: serial number assigned. Firm order. Your order now has a name instead of a number:
D1 – Gate line: unit sequenced for production, est. ship date assigned.
The date is set for your truck to be built. The plant knows when it should have parts sequenced for building and it should start to be built within 48 hours of the date set.
D2 - It's going to be built. The computers are being programmed, materials are being sequenced, framing is about to occur.

Build:
E – Framing. Metal is welded together to form the body and frame. The body is inspected at the end of this step to ensure it's within tolerances.
F – Paint. The metal is coated, primed, sprayed, clearcoated, polished, inspected, and hand finished if necessary.
G – Trim. The engine is installed in the chassis, the interior is installed, the chassis is mated to the body, the bed is put on. At the end of this, your new vehicle is built.

Built:
I – unit built, pending final inspection. Your vehicle goes through a battery of shakedown tests and measurements are taken to ensure the vehicle looks and performs as expected.
J – Vehicle passed final inspection but not released to carrier
JB – shipped to body vendor. JB/KZP-The vehicle is sent off site to have a spray liner put in, steps, etc.
JE – shipped to emissions
JJ – consigned to body vendor
JS – shipped to storage
KZ – released by plant and invoiced. The truck is ready to be shipped. The dealer is actually charged for the truck. As you all know, this can be a source of delay. Typically you see me put two statuses here: Awaiting Shipment and "Staged for Shipment".

Traffic Codes:
KZ L – released but not shipped KZ M – first rail departure
KZ N – first rail arrival
KZ O – delayed/received
KZ OA – plant hold, quality audit
KZ OB – zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle diverted
KZ OC – carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error
KZ OD – mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold
KZ OE – misdropped or misshipped vehicle
KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed
KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction
KZ OH – all other “O” type carrier codes
KZ T – second rail departure
KZ U – second rail arrival
KZ X – delivered to dealer
KZ Y1 – major damage – must not be sold as new
KZ Y2 – major damage – vehicle sold at auction

KZX - Delivered to your dealer!
 

teckademics67

Member
Joined
Jan 11, 2020
Threads
5
Messages
23
Reaction score
10
Location
PA
Vehicle(s)
Jeep JLUR, KLTH, CJ, JTR
Curious if anyone has any insight on the time from F: Paint to KZ: Released by plant , invoiced (window sticker)
 

Sponsored

SEPTIMO2019

Active Member
First Name
T
Joined
Jan 27, 2020
Threads
2
Messages
30
Reaction score
26
Location
Florida
Vehicle(s)
2020 JT Gladiator Rubicon
Not sure, I went from Trim to KZ and Window Sticker in about 7 days. However, I am getting some conflicting information between an ETA to dealer of about two weeks, and being told there is a delay. I suspect, in my case, that Jeep is waiting to FILL the rail car heading to Florida before they release it.
 

Phishs

Well-Known Member
First Name
David
Joined
Jul 27, 2021
Threads
45
Messages
1,106
Reaction score
930
Location
TN
Vehicle(s)
24 JTM, 21 JTR (traded)
Why would an order go from D back to C?
 

JET_83

Banned
Banned
First Name
Eric
Joined
Sep 13, 2020
Threads
3
Messages
1,324
Reaction score
651
Location
US
Vehicle(s)
2022 Jeep Gladiator Overland
The sequence for the build process is: (correct me if I'm wrong) Still trying to figure approximate time in status because there seems to be no rhyme or reason to dime orders taking 2 weeks and others 10+ weeks.

BA: New order that hasn't been checked
BB: Review by fleet department
BD: Special equipment processing
BE: Edit error
BG: Passed edit n/a for schedule
BGL: Edit ok parts unavailable
BX: Passed edit available for schedule
C: Sub firm - Tentative schedule
D: Firm schedule - dealer has allocation and all parts available
D1: Gateline schedule - scheduled to be built
E: Frame
F: Paint
G: Trim
I: Built not ok'd
J: Built ok'd
JB: Vendor Abyss!!!
JE: Emission check
JS: Shipped to storage, really? Someone else near me needs a Jeep or 3!
KZ: Released by plant , invoiced (window sticker)
KZL: Released - not shipped (see JS)
KZM: First rail departure
KZN: First rail arrival
KZO: Delayed/recieved
KZOA: Plant holds
KZOB: Zone/distribution holds (see JS)
KZOC: Carrier delays
KZOD: Carrier holds
KZOE: Mis-shipped vehicle
KZOF: Show/test vehicle
KZOG: Damaged vehicle
KZOH: All other reasons
KZT: Second rail departure
KZU: Second rail arrival
KZX: Delivered to dealer
ZA: Canceled
Does anyone know if they all go through I status?
 

MrB

Active Member
First Name
MrB
Joined
Sep 11, 2020
Threads
3
Messages
43
Reaction score
46
Location
Colorado
Vehicle(s)
‘22 JTM, '19 Audi Q5, '22 SQ5 (ordered)
Occupation
Make the internet go vroom
I know that Jeep chat does not provide codes anymore, but I checked this morning and the wording has changed from:

"...your order is in the scheduling phase of the manufacturing process."

to

"I am showing your vehicle has been scheduled for production. The vehicle should be entering the build process shortly. I'd recommend contacting back in three to four weeks for a new update check."


Does that mean D1? Cryptostickers has not updated.
 

Sponsored

USMC_1Wire6337

Well-Known Member
First Name
Doug
Joined
Mar 15, 2022
Threads
9
Messages
724
Reaction score
1,267
Location
NorCA
Vehicle(s)
2022 JT Sport S/MT; 2017 Ram 2500 4x4 6.4 HEMI
Occupation
IT
I know that Jeep chat does not provide codes anymore, but I checked this morning and the wording has changed from:

"...your order is in the scheduling phase of the manufacturing process."

to

"I am showing your vehicle has been scheduled for production. The vehicle should be entering the build process shortly. I'd recommend contacting back in three to four weeks for a new update check."


Does that mean D1? Cryptostickers has not updated.
There was a hack on the company that provides tracking data on builds to Stellantis. This happened a few weeks ago and has not been fixed yet. The Cryptostickers is not functioning as far as I know. Dealer will have a little more info that Jeep chat, but both are pretty in the dark compared to before the hack.
 

BlueScapegoat

Well-Known Member
First Name
Trevor
Joined
Dec 2, 2018
Threads
14
Messages
1,113
Reaction score
2,708
Location
MN
Vehicle(s)
91 ST185, 04 Ram SRT10, 04 Forester XT, SC'd 05 Rubi, 22 JTRD
Occupation
Air Traffic Controller
Vehicle Showcase
4
Can a mod sticky this thread? I've linked people to it a few times now, because they couldn't find it.
 

harpergreene

Member
Joined
Apr 2, 2022
Threads
2
Messages
10
Reaction score
4
Location
Texas
Vehicle(s)
2022 Gladiator
I received an update today stating I was in E status. For those who have been through this process, how long does it usually take to move through to a completed vehicle?
 

BlueScapegoat

Well-Known Member
First Name
Trevor
Joined
Dec 2, 2018
Threads
14
Messages
1,113
Reaction score
2,708
Location
MN
Vehicle(s)
91 ST185, 04 Ram SRT10, 04 Forester XT, SC'd 05 Rubi, 22 JTRD
Occupation
Air Traffic Controller
Vehicle Showcase
4
 







Top