Thistle-twister
Well-Known Member
- First Name
- Chris
- Joined
- Feb 10, 2022
- Threads
- 0
- Messages
- 104
- Reaction score
- 74
- Location
- Bowling Green, Ky
- Vehicle(s)
- 2022 Gladiator Rubicon Eco Diesel
- Occupation
- Professional Driver
They are building them fast these days, or at least they say they are. Ordered 2-8-22 built 2-17-22 went to shipping 3-12-22 something fishy bout those dates. If you know anything about manufacturing. Once they start building they build and roll em out. They don’t have space or time for these to sit around. The Toledo plant manufacturers one Jeep every 8.5 minutes over two 8 hour shifts. That would fill a lot pretty quickly.He told me this is the fastest he has ever seen a jeep be built. March 1st was when I ordered it, VIN on March 2nd, and built it on the 7th. It's in the rail yard and he said that could take a month or more. They did a hurry up to build and now sit and wait.
I was all pumped for a short time thinking it could be a week or so out.. but I guess it's going to be May like they said.