Mines a fairly middle of the road build I think, skipped a few higher tag items like leather interior and the safety/adaptive cruise. You couldnt pay me to have adaptive cruise.I havenāt been able to piece it together. At D1 status it shouldnāt have be waiting for any parts. My best speculation is there is a backlog at the ābody vendorā where things like bed liner, slush mats and tonneau covers etc. are installed (of which I have all three). Either they just donāt have the capacity causing scheduling delays or body shop components donāt count towards to āD1ā status and something I have was backordered.
Anyone of the 3-4 members whose rides just got delivered to Gupton care to share your build specs?
Edit: Attaching my own build sheet
Im pretty sure thats part of the case. My brother's TRX has gone from D1 to D and back again probably 3 times now. Finally has a build date though.Thanks for sharing!
I suspect that jeep chatās āall materials have been gatheredā just isnāt entirely accurate and one or more of the many boxes I checked were backordered.
Seems pretty normal actually. Mine spent about 5 weeks in D1.Thanks for sharing!
I suspect that jeep chatās āall materials have been gatheredā just isnāt entirely accurate and one or more of the many boxes I checked were backordered.
Yeah I think you are right, I only checked JC once or twice a week and never saw the status regress, but Iām sure it must of.Im pretty sure thats part of the case. My brother's TRX has gone from D1 to D and back again probably 3 times now. Finally has a build date though.
What was your order date? I took me several weeks waiting in D before it ever went to D1.Seems pretty normal actually. Mine spent about 5 weeks in D1.
Once they actually started building it, it was completed and approved for shipping in just over a week. Allegedly in transit now with ETA of 1-24 to 1-31.
YOU are the hero we need! Thank you for this!Looking at everyone who ordered 11/1 to present (2022 production began around 11/22) thereās an average of 34.5 days between order date and estimated ship date. The max days in that data set is me, at 63 days. With a standard deviation of 11.4 that puts me beyond 2 standard deviations but within 3 stdev. So Iām not a total outlier, but very far from average.
*pushes up glasses*
Might have something to do with all of the trains getting robbed recently in CA. System might be backed up and youāre unfortunately the one that has to suffer.I'm not sure about the rest of the world, but in San Diego that message is meaningless. I've had my ETA window pushed back three times. We have humungous lots full of new vehicles near our ports, and I can only assume my Gladiator is sitting there waiting for a driver... I ordered mine on 11/2/21, and my original ETA window was late December. My latest window spans from today through 2/2/22. I'm not trying to be a buzzkill. Hopefully you have better luck than me.
Nice! I got mine this morning too, few weeks out from you though.YOU are the hero we need! Thank you for this!
On a side note, I woke up to this surprise today.
so itās happening?!??!? Itās really happening????
Nice build! So from this maybe it was my floor mats, advanced safety or bed liner?Mines a fairly middle of the road build I think, skipped a few higher tag items like leather interior and the safety/adaptive cruise. You couldnt pay me to have adaptive cruise.
I ordered 12-1-21. Was in D1 within a few days, maybe a week tops. Got an email from Jeep Care today indicating my Jeep should be at the dealer the week of 1-31-22Yeah I think you are right, I only checked JC once or twice a week and never saw the status regress, but Iām sure it must of.
What was your order date? I took me several weeks waiting in D before it ever went to D1.
Check out the tracking sheet created for this thread, not a lot of people fill it out anymore but thereās enough data points for me to do some statistics.
Looking at everyone who ordered 11/1 to present (2022 production began around 11/22) thereās an average of 34.5 days between order date and estimated ship date. The max days in that data set is me, at 63 days. With a standard deviation of 11.4 that puts me beyond 2 standard deviations but within 3 stdev. So Iām not a total outlier, but very far from average.
*pushes up glasses*
Iām not complaining as this is the timing I expected from the get go, itās just interesting to try and figure out the puzzle of jeep production planning.
We may be meeting each other, I got the same email with the same date this morning.Nice! I got mine this morning too, few weeks out from you though.