Tar Heel Wrangler
Well-Known Member
- Joined
- Feb 2, 2018
- Threads
- 0
- Messages
- 171
- Reaction score
- 270
- Location
- Raleigh, NC
- Vehicle(s)
- Sold JLU Sport S for JTM, JL Willys Sport
Hmm, that's slower than mine was projected to be, which was about 2-3 weeks to start the build and ended up 10 days after ordering. I bet it gets built sooner. Latest I received from Travis was a dealer ETA has not been provided; however, it is expected to arrive at the Winston-Salem rail yard by 4/25. I'm told vehicles don't sit longer than a week at that yard. I think it's going to be cutting it close for me to receive it by May 3rd and get the $1000 rebate [crossing fingers].Ooof, I ordered 3/31 and Tri-City said today my “projected build date” is 4/30.
Sponsored