Finally an update. Was told a 6/18 ship date, but hit production 2 days ago. Any idea what build time is? How long it takes? Just curious. Still no window sticker. Still not convinced ship date actually means ship date.
Initial ship date is actually when the body, or perhaps frame? Goes to assembly. It's typically within a day of the date on the door jamb decal that gives final assembly date. A couple days tops for the most part, but the truck gets sent to the vendor areas for bed liner, tonneau cover, that sort of thing.Finally an update. Was told a 6/18 ship date, but hit production 2 days ago. Any idea what build time is? How long it takes? Just curious. Still no window sticker. Still not convinced ship date actually means ship date.
Follow-up: In production. It got a 6/18 build date over three weeks ago, then they moved the target up one day, and hit that target. Estimated delivery date 7/9.Dealer said today was scheduled to start build.
Sarge Green Sport S, tan cloth, manual, 8.4" package, Popular Equip package, Trailer Tow package, LSD, Gorilla Glass, Cold Weather package, Convenience Group, Duelers.
Ordered/VON 4/26.
VIN 5/2.
Build scheduled for 6/18, then 6/17.
Still in "Scheduling" phase as of this morning on Jeep Order Tracking site. Hopefully an interesting update tomorrow!
My time line is nearly identical. Ordered 4/28.Follow-up: In production. It got a 6/18 build date over three weeks ago, then they moved the target up one day, and hit that target. Estimated delivery date 7/9.
Ordered/VON 4/26.
VIN 5/2.
Build scheduled for 6/18, then 6/17.
In production 6/17
Edit: Still no build sheet on Crypto Stickers
I'm outside Detroit. The dealership is maybe 2 hours from the Toledo plant, so I'm assuming it won't ever get on a train. Perhaps it's a standard assumption...?My time line is nearly identical. Ordered 4/28.
In production 6/17
Estimate delivery date of 7/9
Rubicon diesel in stinggray
Are you near Pennsylvania by any chance? Just wondering if thats why we have the same delivery date or if its generic
Interesting. I've noticed other guys here with JTs that are being built around right now with estimated delivery dates of TBD and and end of July.I'm outside Detroit. The dealership is maybe 2 hours from the Toledo plant, so I'm assuming it won't ever get on a train. Perhaps it's a standard assumption...?
Also, did you order a stick? EDIT: Never mind, you said it's a diesel
Check your build status. Mine just flipped from production to builtI'm outside Detroit. The dealership is maybe 2 hours from the Toledo plant, so I'm assuming it won't ever get on a train. Perhaps it's a standard assumption...?
Also, did you order a stick? EDIT: Never mind, you said it's a diesel
Yep- mine too!Check your build status. Mine just flipped from production to built
My estimated delivery date also changed from 7/9 to 7/11Yep- mine too!
Mine went from 7/9 to 6/29. Presumably they temporarily use a standard estimate before some actual scheduling takes place. I suspect it could change again as they get trucks sequenced.My estimated delivery date also changed from 7/9 to 7/11
Wow, yours went from ordered to scheduled in under 2 weeks. Mine took a full month just to be scheduled, and still says TBD over 2 weeks after being scheduled.One step closer.